Click Photo to Enlarge / Swipe or Drag to Scroll
Click Photo to Enlarge / Swipe or Drag to Scroll
2017
Craghurst Riparian Mitigation Site
The 3,025 feet of intermittent stream channel and riparian corridor on this site in the Meramec watershed will help control runoff from nearby subdivisions. This is an In-Lieu Fee site is constructed with the goal to restore and preserve a stream and its riparian corridor with a desirable plant community.